Bond Issue/Proposition Safe Bulldog Completed!

Bond Issue/Proposition Safe Bulldog Completed!
Posted on 06/11/2024
Clipart of a loading bar showing 100 percent

Bleachers

Before:

Facing northwest, old bleachers and press boxFacing southeast, rear of old bleachers and press boxUnderneath bleachers, rusted support

After:

Facing northeast, new bleachers and press box

Concession Stand

Before:

Interior, old concession stand

After:

Facing east, northeast; exterior of new concession stand

Administration Building

Old:

Deteriorating wall in boardroomSevere cracks in walls

New:

Facing south; exterior of new admin buildingInterior; main hallway of new admin buildingInterior; new board room with audience seating at north side of room (unpictured)Facing south; shop space currently used for archery and storage

Girl's Athletics Locker room

Before:

Old teacher's lounge converted to makeshift locker roomBathroom adjacent to old teacher's lounge used for storage

After:

New locker room with connected bathroom and showers to the north (unpictured)

Weight room Improvements

(Expanded to take up old concession stand space)

Facing southeast; new space and rolling doorFacing southwest; improvements and expansion of weight room

HVAC Units

Before:

Rusted, old smaller HVAC unitRusted, old larger HVAC unit

After:

New smaller HVAC unitNew larger HVAC unit

Doors Across District

Before:

Old double doors with rust eating away at the edges

After:

New double doors with integrated access security

Mortar Repair

Before:

Mortar that has moss and other growthMortar that has eroded away

After:

New, clean mortar

Rooftop Repairs

Before:

Rooftop in rough shapeDeteriorated fascia board

After:

Renovated rooftop, fascia boards, and guttering

Website by SchoolMessenger Presence. © 2025 SchoolMessenger Corporation. All rights reserved.